Skip to main content

Fire and gas detection order

Oct 01, 2013

Consilium have received a complete retrofit turnkey project for a drillship owned by Noble Drilling. The existing conventional fire and gas detection system will be replaced and the installation will be carried out at STX Goseong shipyard. The installation is planned to be ready before the end of this year. Consilium will be in charge of the entire process, including replacement of all fire and gas detectors, installation, commissioning and full test with classification society.

The vessel will be classified for ICE class and is therefore need of a gas detectors will be used that withstand the -40degrC environment demands on drilling area.